• R&D Center @FGC UES, JSC
    RESEARCH AND DEVELOPMENT CENTER AT FEDERAL GRID COMPANY OF UNIFIED ENERGY SYSTEM, JOINT STOCK COMPANY
  • R&D Center @FGC UES, JSC
    RESEARCH AND DEVELOPMENT CENTER AT FEDERAL GRID COMPANY OF UNIFIED ENERGY SYSTEM, JOINT STOCK COMPANY
  • R&D Center @FGC UES, JSC
    RESEARCH AND DEVELOPMENT CENTER AT FEDERAL GRID COMPANY OF UNIFIED ENERGY SYSTEM, JOINT STOCK COMPANY
  • R&D Center for Power Engineering
    has one of the largest Russian testing center
  • R&D Center @FGC UES, JSC
    RESEARCH AND DEVELOPMENT CENTER AT FEDERAL GRID COMPANY OF UNIFIED ENERGY SYSTEM, JOINT STOCK COMPANY
  • R&D Center for Power Engineering
    unity of professionalism, long experience and scientific potential
  • R&D Center @FGC UES, JSC
    RESEARCH AND DEVELOPMENT CENTER AT FEDERAL GRID COMPANY OF UNIFIED ENERGY SYSTEM, JOINT STOCK COMPANY
  • R&D Center for Power Engineering
    unique offers in the sphere of power generation
Company news
15.07.11 The division head of the researches in the sphere of the superconductivity Victor Sytnikov (R&D Center for power engineering) made the appearance to the FGS UES management personnel
The second appearance under the formed plan of the monthly statements of the “R&D Center for power engineering” leading researches was held for the management personnel of the “FGS UES” JSC.
12.07.11 The representatives of “R&D Center for power engineering” JSC took part in the innovative projects expertise under the forum “Seliger-2011”
From July 6 till July 7, 2011 the specialists of “R&D Center for power engineering” took part in the R&D innovative projects expertise from the youth innovative center “System-Sarov” in the line of “energy efficiency and power saving” under the National youth forum “Seliger-2011”
04.07.11 Siemens LLC and “R&D Center for power engineering” signed the cooperation agreement
The opening ceremony of the plant “Siemens HV devices” LLC (Voronezh) was held the 1 June 2011.

28.04.11 RDCPE Experts Participate in the 6th International Science and Practice Seminar for Electric Power Energy
On April 18th – 23rd, 2011, RDCPE representatives took part in the International Science and Practice Seminar for Electric Power Energy “Important Aspects of Ensuring Reliability, Safety and Effectiveness in Energy System, Grid and Substation Equipment Operations” (IES-6). The seminar was organized by the Executive committee of the CIS Electric Energy Board in collaboration with St. Petersburg Training Institute for Electric Power. This was the 6th time the seminar, by now a widely popular event in the electric energy community, took place.
27.04.11 Concept Blueprint of Software & Hardwire Suite for the Digital Substation Completed and Submitted to FGC UES for Approval
Per agreement # И-11-41/10, the experts of RDCE in collaboration with Energosetproekt Institute and Continuum + LLC have developed a Concept blueprint of hardware and software suite for the digital substation of Federal Grid Company. The product was completed and submitted to FGC UES for review and approval.
Branch events
12.04.2018 FGC UES and GE Grid Solutions have discussed in Moscow the development of electrical equipment production in Russia

Chairman of the Management Board of FGC UES, Andrey Murov, and Director General of GE Grid Solutions (division of General Electric in USA) in Europe, Russia and CIS, Gerhard Seyrling, have conducted negotiations for broadening of cooperation between the companies and development of innovative electrical equipment production in the Russian Federation.

05.04.2018 FGC UES has reconstructed the special passages of power transmission lines through Volga river to ensure the reliability of power generation by Saratovskaya HPP

FGC UES (a member of Rosseti) has completed the reconstruction of special passages of power transmission lines 220 kV Balakovo 1 and Balakovo 2 through the Volga River. It allowed to increase the reliability of power delivery by Saratovskaya hydropower plant and electricity supply to the whole region. More than 1.4 bln RUB has been invested into this project.

29.03.2018 Based on the results of 2017, 83.7% of FGC UES power facilities have been covered with digital communication channels.

In 2017 the length of basic technological communication network of FGC UES (a member of Rosseti), fiber-optic communication lines (VOLS), increased up to 73.6 thousand km. It is planned to extend it to 105 thousand km by 2025, which, coupled with other modern telecommunications technologies*, will allow to cover approximately 90% of the company’s substations with digital communication channels. This will increase the quality of infrastructure management, the reliability of electric power supply to consumers and contribute to operating cost optimization.

27.03.2018 In 2018 FGC UES will implement innovative systems to increase energy efficiency at three substations in the Central Region of Russia

This year at FGC UES substations (a member of Rosseti) of extra high voltage 750 kV located in the Central Region of Russia (Opytnaya, Bely Rast and Metallurgicheskaya) a proprietary innovative cooling system will be installed. Auxiliary power requirements for these facilities will decrease by 40%, which is equal to 9 mln kWh* per annum.

26.03.2018 During the Earth Hour, FGC UES saved about 11 megawatt-hours of electricity

FGC UES (a member of Rosseti) took part in the Annual International Event “Earth Hour” for the fifth time. The lighting which did not affect the productive activity and safety provision was partially switched off for 60 minutes at 773 power facilities and company’s administrative buildings throughout Russia.

26.03.2018 Federal Grid Company Announces FY 2017 IFRS Results

Federal Grid Company of Unified Energy System (“Federal Grid Company” or “the Company”; Moscow Exchange, LSE: FEES), part of PJSC ROSSETI Group of Companies, and the operator of the Unified National Electricity Grid (“UNEG”), announces its audited consolidated financial results for the year ended 31 December 2017 under International Financial Reporting Standards (IFRS).

Our projects
Address: 115201, Moscow, Kashirsky highway, 22, 3
Tel: (495) 727-19-09
Developed by

magic design lab